Manual of the Krones Aseptic line CC Xiamen
Content 内容
Sterilization UHT / Bloc 3 UHT 杀菌系统/洁净空间
Production preparation 生产准备
Production 生产
Type change over 产品转换
End of production 生产结束
Empty the disinfection bath 清空盖槽
CIP caustic and acid CIP 碱酸洗
N2 injector 滴氮系统
1
Lars Junge Krones AG AQUA Changes possible
Krones AG 6 14 16 20 23 26 29 139911836.doc
Manual of the Krones Aseptic line
Krones 无菌生产线手册
Sterilization UHT / Bloc UHT 杀菌系统/洁净空间
MMA -> Programs程序 -> Program selection, general, U01
2 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Sterilization 杀菌 -> Sterilization杀菌 -> Start开始
3 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Activating the step sequences, it is possible to follow the program 启动程序步骤,才有可能进行程序操作
MMA -> Step sequences -> Step sequence general U01
4 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
During sterilization, temperatures and flow is controlled by the PCS. These temperatures have to reach at least 121 °C minimum for 20 min.
在杀菌(SIP )期间,温度以及流体的流量由PCS 控制。杀菌温度必须达到至少121 °C 并且保持20分钟。
At the end of the sterilization process it is necessary to reset the step sequence with the blue button on the PCS (end phase).
在杀菌过程完成的时候,有必要使用蓝色按钮重置步骤,
5 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Production preparation 生产准备
The preparation of production includes the following: 生产准备包括如下步骤:
- Take out the rinser CIP caps (manually) 取下冲瓶机CIP 洗杯(人工) - Take out the filler CIP caps 取下灌注机CIP 洗杯 - Preparation of PAA PAA准备
- Disinfection of the filler Bloc 无菌空间消毒
- Fill up the filler with sterile product from Tetra-Pak 用Tetra-Pak 系统提供的无菌产品充满注入机(环缸)
MMA -> Programs -> Program selection general, U01
6 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
An outside alkaline cleaning (COP) will start. 外部碱清洗(COP )将开始
After the COP is finished it is necessary to remove the CIP caps of the rinser. COP 结束之后,必须取下洗瓶机的CIP 洗杯
The key at the filler touch has to be turned to position 1. 注入机操作器的钥匙必须旋到一号位
Use gloves to remove the CIP caps. 使用手套取下CIP 洗杯
7 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
After removing the CIP caps returm the key to position 0. and confirm that the CIP cups are located in the touch screen.在取下CIP 洗杯后,把钥匙旋回0号位,
MMA -> Programs -> Rinser
8 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
The machine starts turning and an SIP is starting. 机器开始进行SIP 清洗
Select the product you want to fill at the PCS 在PCS 上选择即将灌注的产品。
9 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Choose the product and press the folder button 选择产品并按下文件夹按钮
10 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
And confirm with yes!
用YES 确认
11 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
A last “ operator intervention executed ”
is necessary to confirm the product 最后“操作者干预被执行”去确认产品。
MMA -> Munue FC General01
12 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
After finishing the production preparation it is necessary to confirm with the blue button of the PCS
完成生产准备之后,按下PCS 蓝色按钮确认。
And start the production program.
开始生产程序
13
Lars Junge Krones AG AQUA
Changes possible
Krones AG 139911836.doc
Production
生产
MMA -> Programs -> Program selection general, U01
Production 生产 -> Production生产 -> Start开始
All functions in automatic in the filler touch
所有功能在注入触摸屏内自动进行
14 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Change of product
产品更换
Before filling the last xxxx liters you have to start with the following procedure: 在灌装最后xxxx 升饮料之前,必须开始下列步骤
Stop the production sequence by pressing this button:
按下此按钮来停止生产步骤
And reset the program with the blue button.
以及用蓝色按钮重置程序
15 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Starting of the program “Type change over with IR”
开始程序“产品类型更改???”
16 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
When the step sequence asks for the product change over, change the product in the PCS and confirm it.
当程序步骤要求产品更换时,在PCS 上更换产品并确认
Choose the new product:
选择新产品
17 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Choose the new product and confirm with the folder button
选择新产品以及按下文件夹按钮确认
18 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
And confirm with yes!
用YES 确认
19 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
End of production
生产结束
MMA -> Functions
After reseting the program with the blue button (end phase) start the production program again see page 14.
在用蓝色按钮重置程序(阶段结束)后,重新启动生产程序(请参见第14页) 20 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Stop the production sequence:
停止生产步骤
And reset the sequence (end phase) with the blue button.
使用蓝色按钮重置步骤(阶段结束)
21 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
MMA -> Programs -> Program selection general, U01
Production 生产 -> End of production生产结束 -> Start开始
22 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
After terminating the production you have to clean the whole filler. Take out bottles, caps etc.
最终生产之后,必须清洗整个灌注机。清理瓶子盖子等
The program to empty the disinfection bath:
程序清空洗盖槽
MMA -> Programs -> Cap disinfection system
Turn off the external start
关掉外部开始
Lars Junge Krones AG AQUA
Changes possible
Krones AG 23 139911836.doc
Select the program “Empty disinfection bath选择清空洗盖槽选项
Move the closure guidance back and Open the closure outlet.
以及打开取盖出口
Lars Junge Krones AG AQUA
Changes possible
Krones AG 24 139911836.doc
After taking out the closures the external start has to be activated again, the outlet has to be closed and the close guidance put back in the initial position.
在取出盖子之后,外部开始必须重新启动,取样口必须关上以及盖引导器必须恢复初始位置
25 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
CIP caustic / caustic and acid
CIP 碱洗/碱酸洗
Before starting the caustic cleaning (caustic and acid CIP is only necessary once a week) check if the CIP cups at the rinser are placed.
开始碱洗之前(碱酸洗CIP 只需要每周进行一次),检查洗瓶机CIP 洗杯是否已安置完毕
Then you start the program:
然后可以开始程序
26 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Cleaning -> Caustic (Or caustic & acid) -> Start
27 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
At the end of the CIP (end phase of the step sequence) you always have to reset the step sequence by pressing the blue button.
在CIP 结束的时候(步骤阶段结束),必须一直用蓝色按钮来重置步骤
28
Lars Junge Krones AG AQUA
Changes possible
Krones AG 139911836.doc
N 2 injector
滴氮系统
Before being able to use the N2 injector it is necessary to sterilize the machine and fill it with N2.
在可以使用滴氮系统之前,有必要对其进行杀菌,并且将其注满液氮
All functions of the injector can be operated at the PCS.
所有滴氮系统的功能都可以在PCS 上进行操作
MMA -> Functions
After sterilization and emptying the N2 injector you can take a sample which has to be confirmed as well.
在杀菌以及排空N2滴氮系统之后,需要对滴氮系统进行取样并且确认
29 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Manual of the Krones Aseptic line CC Xiamen
Content 内容
Sterilization UHT / Bloc 3 UHT 杀菌系统/洁净空间
Production preparation 生产准备
Production 生产
Type change over 产品转换
End of production 生产结束
Empty the disinfection bath 清空盖槽
CIP caustic and acid CIP 碱酸洗
N2 injector 滴氮系统
1
Lars Junge Krones AG AQUA Changes possible
Krones AG 6 14 16 20 23 26 29 139911836.doc
Manual of the Krones Aseptic line
Krones 无菌生产线手册
Sterilization UHT / Bloc UHT 杀菌系统/洁净空间
MMA -> Programs程序 -> Program selection, general, U01
2 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Sterilization 杀菌 -> Sterilization杀菌 -> Start开始
3 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Activating the step sequences, it is possible to follow the program 启动程序步骤,才有可能进行程序操作
MMA -> Step sequences -> Step sequence general U01
4 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
During sterilization, temperatures and flow is controlled by the PCS. These temperatures have to reach at least 121 °C minimum for 20 min.
在杀菌(SIP )期间,温度以及流体的流量由PCS 控制。杀菌温度必须达到至少121 °C 并且保持20分钟。
At the end of the sterilization process it is necessary to reset the step sequence with the blue button on the PCS (end phase).
在杀菌过程完成的时候,有必要使用蓝色按钮重置步骤,
5 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Production preparation 生产准备
The preparation of production includes the following: 生产准备包括如下步骤:
- Take out the rinser CIP caps (manually) 取下冲瓶机CIP 洗杯(人工) - Take out the filler CIP caps 取下灌注机CIP 洗杯 - Preparation of PAA PAA准备
- Disinfection of the filler Bloc 无菌空间消毒
- Fill up the filler with sterile product from Tetra-Pak 用Tetra-Pak 系统提供的无菌产品充满注入机(环缸)
MMA -> Programs -> Program selection general, U01
6 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
An outside alkaline cleaning (COP) will start. 外部碱清洗(COP )将开始
After the COP is finished it is necessary to remove the CIP caps of the rinser. COP 结束之后,必须取下洗瓶机的CIP 洗杯
The key at the filler touch has to be turned to position 1. 注入机操作器的钥匙必须旋到一号位
Use gloves to remove the CIP caps. 使用手套取下CIP 洗杯
7 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
After removing the CIP caps returm the key to position 0. and confirm that the CIP cups are located in the touch screen.在取下CIP 洗杯后,把钥匙旋回0号位,
MMA -> Programs -> Rinser
8 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
The machine starts turning and an SIP is starting. 机器开始进行SIP 清洗
Select the product you want to fill at the PCS 在PCS 上选择即将灌注的产品。
9 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
Choose the product and press the folder button 选择产品并按下文件夹按钮
10 139911836.doc
Lars Junge Krones AG AQUA Changes possible
Krones AG
And confirm with yes!
用YES 确认
11 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
A last “ operator intervention executed ”
is necessary to confirm the product 最后“操作者干预被执行”去确认产品。
MMA -> Munue FC General01
12 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
After finishing the production preparation it is necessary to confirm with the blue button of the PCS
完成生产准备之后,按下PCS 蓝色按钮确认。
And start the production program.
开始生产程序
13
Lars Junge Krones AG AQUA
Changes possible
Krones AG 139911836.doc
Production
生产
MMA -> Programs -> Program selection general, U01
Production 生产 -> Production生产 -> Start开始
All functions in automatic in the filler touch
所有功能在注入触摸屏内自动进行
14 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Change of product
产品更换
Before filling the last xxxx liters you have to start with the following procedure: 在灌装最后xxxx 升饮料之前,必须开始下列步骤
Stop the production sequence by pressing this button:
按下此按钮来停止生产步骤
And reset the program with the blue button.
以及用蓝色按钮重置程序
15 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Starting of the program “Type change over with IR”
开始程序“产品类型更改???”
16 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
When the step sequence asks for the product change over, change the product in the PCS and confirm it.
当程序步骤要求产品更换时,在PCS 上更换产品并确认
Choose the new product:
选择新产品
17 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Choose the new product and confirm with the folder button
选择新产品以及按下文件夹按钮确认
18 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
And confirm with yes!
用YES 确认
19 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
End of production
生产结束
MMA -> Functions
After reseting the program with the blue button (end phase) start the production program again see page 14.
在用蓝色按钮重置程序(阶段结束)后,重新启动生产程序(请参见第14页) 20 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Stop the production sequence:
停止生产步骤
And reset the sequence (end phase) with the blue button.
使用蓝色按钮重置步骤(阶段结束)
21 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
MMA -> Programs -> Program selection general, U01
Production 生产 -> End of production生产结束 -> Start开始
22 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
After terminating the production you have to clean the whole filler. Take out bottles, caps etc.
最终生产之后,必须清洗整个灌注机。清理瓶子盖子等
The program to empty the disinfection bath:
程序清空洗盖槽
MMA -> Programs -> Cap disinfection system
Turn off the external start
关掉外部开始
Lars Junge Krones AG AQUA
Changes possible
Krones AG 23 139911836.doc
Select the program “Empty disinfection bath选择清空洗盖槽选项
Move the closure guidance back and Open the closure outlet.
以及打开取盖出口
Lars Junge Krones AG AQUA
Changes possible
Krones AG 24 139911836.doc
After taking out the closures the external start has to be activated again, the outlet has to be closed and the close guidance put back in the initial position.
在取出盖子之后,外部开始必须重新启动,取样口必须关上以及盖引导器必须恢复初始位置
25 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
CIP caustic / caustic and acid
CIP 碱洗/碱酸洗
Before starting the caustic cleaning (caustic and acid CIP is only necessary once a week) check if the CIP cups at the rinser are placed.
开始碱洗之前(碱酸洗CIP 只需要每周进行一次),检查洗瓶机CIP 洗杯是否已安置完毕
Then you start the program:
然后可以开始程序
26 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
Cleaning -> Caustic (Or caustic & acid) -> Start
27 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG
At the end of the CIP (end phase of the step sequence) you always have to reset the step sequence by pressing the blue button.
在CIP 结束的时候(步骤阶段结束),必须一直用蓝色按钮来重置步骤
28
Lars Junge Krones AG AQUA
Changes possible
Krones AG 139911836.doc
N 2 injector
滴氮系统
Before being able to use the N2 injector it is necessary to sterilize the machine and fill it with N2.
在可以使用滴氮系统之前,有必要对其进行杀菌,并且将其注满液氮
All functions of the injector can be operated at the PCS.
所有滴氮系统的功能都可以在PCS 上进行操作
MMA -> Functions
After sterilization and emptying the N2 injector you can take a sample which has to be confirmed as well.
在杀菌以及排空N2滴氮系统之后,需要对滴氮系统进行取样并且确认
29 139911836.doc
Lars Junge Krones AG AQUA
Changes possible
Krones AG