工程英语单词

Lesson 2

access road 入场道路 architect 建筑师

at a specified time and cost 在规定的时间和成本 basic and finished material 原材料和加工好的材料

building stage 施工阶段 cleaning up 清场

concrete mixer 混凝土搅拌机 construction industry 建筑业 construction method 施工方法 constructor 施工方

Engineering projects management 工程管理 equipment distributor 设备经销商 general contractor 总承包商

making the site ready 准备好了施工现场 manufacturer 制造商 material dealer 材料商 owner/client/employer 业主 residential construction 住宅建设 site condition 现场条件 speciality contractor 专业承包商 Specification/provision/regulation 规范 stage 阶段

subcontractor 分包商 the peak period 顶峰阶段 warehouse 仓库

within the required time at the lowest cost 在规定的时间内以最低的成本 working-plan 进度计划

Lesson 3

arrangement 布局 childcare center 幼儿园 civil building 民用建筑 community center 社区中心 dwelling 居住

evenly distributed 均匀的分布

evenly distributed load 均布荷载 exhibition hall 展览馆 flat 公寓 grain shop 粮店

in highly industrialized 高度工业化 industrial building 工业建筑 multi-story ones 多层 office building 办公楼/写字楼 process plant 加工厂 public building 公共建筑 public transportation 公共交通 reception room 接待室 reinforced concrete 钢筋混凝土 school room 书房

single-family home 独门独户 single-story 单层 station 车站 suburban 城镇

town-planning 城镇规划 wage earner 工薪族

Lesson 4

best price performance 最佳性价比 bid evaluation by designer 评标 bid 出价

bolted connection 螺栓连接 brick 转头

bulk material 大宗散料 cement 水泥 column 柱子 craftsmen 工匠 cumulative 累计 earthwork 土方工程 electrician 电工 element 构件

fabricated member or unit 预制构件fabricator 安装施工方

field erection/assembly 现场安装

field labor 现场劳动力

field storage and installation现场储备 freight delivery 货物运输 gravel 砾石 in stock 库存

inquiry issued to vendor 向供货商询价 invoice 发票

manufactured product 制成品 off-the-shelf material 储存的材料 overlapping 搭接 pipefitter 管道工

place purchase order 下订货单 preliminary shop drawing 初步安装图 pre-processed/prefabricated 预制 Procurement and delivery 采购和运输 purchase order 采购单 quotation 报价

ready-concrete 预制混凝土 rehandling 再处理 sand 沙子

semi-processed state 半加工 slippage or contraction 延长或压缩 specific craft 特殊工艺 steel beam 钢梁 welded 焊接

wet concrete mix 湿混凝土拌合物

Lesson 9

activity logic 工序

activity relationship 工序关系

arrow notation/Activity on Arrow (AOA )双代号网络图

bar chart 横道图/甘特图 budget 预算

circle notation/Activity on Node (AON)单代号网络图

construction drawing 施工图纸 cost of money 资金成本/股息股利

critical path method 关键路径法 dummy activity 虚工作 duration 工期

feasibility analysis 可行性研究 financing 融资

following activity 后续工作 interest rate 利率 interest 利息

network model 网络图 network node 网络图节点

optimal activity timing 最佳活动工序时间 procurement 采购

resource allocation 资源配置 schematic design 初步设计 start and finish time 起始时间 turn over 移交

visual effectiveness 直观性 work progress 工作进度 working drawing 施工详图

Lesson 13

contractual amount for payment 合同规定的付款额

direct construction cost 直接工程费 direct cost 直接费 estimator 估算师

extra charge of education funds 教育费附加 fabrication and installation 制作和安装 fees 规费

field overhead 现场管理费

have the vision to see beyond 远见卓识 home-officeoverhead 非工资费用 income tax 所得税

increment tax on land value 土地增值税 indirect cost 间接费 insurance 保险 measure cost 措施费 nail 钉子

permanent document 永久性文件 permit 许可证

process equipment 加工设备 procuring equipment 设备的购买成本 proposal 投标书 screw 螺钉

tax on business 营业税 wiring 布线

Lesson 17

common practice 通常做法 concrete pavement 混凝土道路 condition 合同条件 contract 合同

cost-plus-a-fixed-fee-contract 成本加固定酬金合同

cost-plus-fee contract 成本加酬金合同 cost-plus-incentive-fee-contract 成本加激励酬金合同

cost-plus-percentage-fee contract 成本加固定百分比酬金合同 cubic 立方码 earn a profit 获利 engaging 雇人

finance the project 酬资 furnished 提供 head office 总部 heavy 重型建筑 highway 高速公路 idle equipment 停滞的设备 linear 线性英尺

lump-sum contract 总价合同 municipal 市政工程 on-site cost 现场费用

performance bond/Performance Security/the Performance Certificate履约保函 pipeline 管道 reimburse 偿还

specialize 专注于

specified interval 规定间歇 specified sum of 规定的总数目 steel erection 钢铁建造 surety 保证人 sustain a loss 承受损失 term 条款

the Contract Agreement 合同协议书 the Drawing 图纸

the Letter of Acceptance 中标函 the Letter of Tender 投标书 the Schedule 计划表 the Specification 规范 unit-price contract 单价合同

Lesson 18

adequacy 完备性

as-built document 竣工文件 at his cost 自费 consumable 消耗品 currency 币种 dismantle 拆卸 execute 施工 expiry date 期满日期 extent 范围

General Condition 一般条件 in accordance with 按照 instruction 指令

operation and maintenance manual 操作维修手册

Particular Condition 专用条件 Party’s design 手写信息 reassemble 重新组装 Site operation 现场作业 stability 可靠性 Sub-Clause 分条款 submit 提交 taking-over 移交

Temporary Work 临时工程 the Appendix to Tender 投标附录 the Tests on Completion 竣工验收

Lesson 21

bid analysis 投标分析 bid forms 招标程序 bidder 投标者

certifier check 保付支票 claim 索赔 default 违约 deficiency 缺陷

delay of progress 工期延误 deviation 偏离

guarantee-warranty periods 保修期 insurer 承保人 negotiation 议标

notice to bidders 投标者需知 open/public bidding 公开招标 potential bidder 潜在投标人 prebid conference 标前会议 prebid meeting 标前会议 prescribe 【v 】规定 public work 公共工程 receipt of bid 接受标书 regulate 规定

release of the bid 放弃投标 representative 代表 retention money 留存款

selected bidding /bid invitation/invitation to bidders 邀请招标

signing of the contract 合同签订 solicits bids 请求投标 successful bidder 中标人 the construction period 施工期 the governing authority 政府机构

the unpaid balance of the contract 合同未结算价款

time-consuming 费时的

unforeseen circumstance 不可预见的情况 variation 变化

Lesson 22

award of contract 合同授予 bid opening 开标

bidding document 招标文件 civil works 土木工程 combination of bids 组合标 commercial bid 商务标 priced proposal 有价格的标书 returned unopened 原封不动返还 technical bid 技术标

the date for latest delivery of bids 投标截止日期the date of invitation to bid 招标日期 the required sureties 被同意的保险人 turnkey contract 交钥匙合同 validity of bids 标书有效期

纸条扩充

agreement is the strongest of them all 协议是具有最高效力的

applying a tensile load 施加一个拉力 bond 担保

brittle material 脆性材料 building material 建筑材料 civil engineering 土木工程 compression test 抗压试验 concentrated load 集中荷载 dam 大坝

distributed load 分布荷载 ductile material 延性材料 force 力 harbor 港口

instructions to bidders 投标者需知 legal residence 法律注册地址 load 荷载

mass transit 公共交通 nonuniform 非均布

population concentration 聚集地 power plat 发电站

prequalification of contractor 资格预审 prescribed 规定 provision 规定

public facilities 必要基础设施 signature 签名 skyscraper 摩天大厦

strength test to destruction 破坏强度试验

strength 抗压强度 tensile strength 抗拉强度 the loaded member 被加载的构件 the proposals 标书 tunnel 隧道 uniform 均布

uniformly distributed load 均布荷载 water and sewage system 给排水系统 weight 自重

Lesson 2

access road 入场道路 architect 建筑师

at a specified time and cost 在规定的时间和成本 basic and finished material 原材料和加工好的材料

building stage 施工阶段 cleaning up 清场

concrete mixer 混凝土搅拌机 construction industry 建筑业 construction method 施工方法 constructor 施工方

Engineering projects management 工程管理 equipment distributor 设备经销商 general contractor 总承包商

making the site ready 准备好了施工现场 manufacturer 制造商 material dealer 材料商 owner/client/employer 业主 residential construction 住宅建设 site condition 现场条件 speciality contractor 专业承包商 Specification/provision/regulation 规范 stage 阶段

subcontractor 分包商 the peak period 顶峰阶段 warehouse 仓库

within the required time at the lowest cost 在规定的时间内以最低的成本 working-plan 进度计划

Lesson 3

arrangement 布局 childcare center 幼儿园 civil building 民用建筑 community center 社区中心 dwelling 居住

evenly distributed 均匀的分布

evenly distributed load 均布荷载 exhibition hall 展览馆 flat 公寓 grain shop 粮店

in highly industrialized 高度工业化 industrial building 工业建筑 multi-story ones 多层 office building 办公楼/写字楼 process plant 加工厂 public building 公共建筑 public transportation 公共交通 reception room 接待室 reinforced concrete 钢筋混凝土 school room 书房

single-family home 独门独户 single-story 单层 station 车站 suburban 城镇

town-planning 城镇规划 wage earner 工薪族

Lesson 4

best price performance 最佳性价比 bid evaluation by designer 评标 bid 出价

bolted connection 螺栓连接 brick 转头

bulk material 大宗散料 cement 水泥 column 柱子 craftsmen 工匠 cumulative 累计 earthwork 土方工程 electrician 电工 element 构件

fabricated member or unit 预制构件fabricator 安装施工方

field erection/assembly 现场安装

field labor 现场劳动力

field storage and installation现场储备 freight delivery 货物运输 gravel 砾石 in stock 库存

inquiry issued to vendor 向供货商询价 invoice 发票

manufactured product 制成品 off-the-shelf material 储存的材料 overlapping 搭接 pipefitter 管道工

place purchase order 下订货单 preliminary shop drawing 初步安装图 pre-processed/prefabricated 预制 Procurement and delivery 采购和运输 purchase order 采购单 quotation 报价

ready-concrete 预制混凝土 rehandling 再处理 sand 沙子

semi-processed state 半加工 slippage or contraction 延长或压缩 specific craft 特殊工艺 steel beam 钢梁 welded 焊接

wet concrete mix 湿混凝土拌合物

Lesson 9

activity logic 工序

activity relationship 工序关系

arrow notation/Activity on Arrow (AOA )双代号网络图

bar chart 横道图/甘特图 budget 预算

circle notation/Activity on Node (AON)单代号网络图

construction drawing 施工图纸 cost of money 资金成本/股息股利

critical path method 关键路径法 dummy activity 虚工作 duration 工期

feasibility analysis 可行性研究 financing 融资

following activity 后续工作 interest rate 利率 interest 利息

network model 网络图 network node 网络图节点

optimal activity timing 最佳活动工序时间 procurement 采购

resource allocation 资源配置 schematic design 初步设计 start and finish time 起始时间 turn over 移交

visual effectiveness 直观性 work progress 工作进度 working drawing 施工详图

Lesson 13

contractual amount for payment 合同规定的付款额

direct construction cost 直接工程费 direct cost 直接费 estimator 估算师

extra charge of education funds 教育费附加 fabrication and installation 制作和安装 fees 规费

field overhead 现场管理费

have the vision to see beyond 远见卓识 home-officeoverhead 非工资费用 income tax 所得税

increment tax on land value 土地增值税 indirect cost 间接费 insurance 保险 measure cost 措施费 nail 钉子

permanent document 永久性文件 permit 许可证

process equipment 加工设备 procuring equipment 设备的购买成本 proposal 投标书 screw 螺钉

tax on business 营业税 wiring 布线

Lesson 17

common practice 通常做法 concrete pavement 混凝土道路 condition 合同条件 contract 合同

cost-plus-a-fixed-fee-contract 成本加固定酬金合同

cost-plus-fee contract 成本加酬金合同 cost-plus-incentive-fee-contract 成本加激励酬金合同

cost-plus-percentage-fee contract 成本加固定百分比酬金合同 cubic 立方码 earn a profit 获利 engaging 雇人

finance the project 酬资 furnished 提供 head office 总部 heavy 重型建筑 highway 高速公路 idle equipment 停滞的设备 linear 线性英尺

lump-sum contract 总价合同 municipal 市政工程 on-site cost 现场费用

performance bond/Performance Security/the Performance Certificate履约保函 pipeline 管道 reimburse 偿还

specialize 专注于

specified interval 规定间歇 specified sum of 规定的总数目 steel erection 钢铁建造 surety 保证人 sustain a loss 承受损失 term 条款

the Contract Agreement 合同协议书 the Drawing 图纸

the Letter of Acceptance 中标函 the Letter of Tender 投标书 the Schedule 计划表 the Specification 规范 unit-price contract 单价合同

Lesson 18

adequacy 完备性

as-built document 竣工文件 at his cost 自费 consumable 消耗品 currency 币种 dismantle 拆卸 execute 施工 expiry date 期满日期 extent 范围

General Condition 一般条件 in accordance with 按照 instruction 指令

operation and maintenance manual 操作维修手册

Particular Condition 专用条件 Party’s design 手写信息 reassemble 重新组装 Site operation 现场作业 stability 可靠性 Sub-Clause 分条款 submit 提交 taking-over 移交

Temporary Work 临时工程 the Appendix to Tender 投标附录 the Tests on Completion 竣工验收

Lesson 21

bid analysis 投标分析 bid forms 招标程序 bidder 投标者

certifier check 保付支票 claim 索赔 default 违约 deficiency 缺陷

delay of progress 工期延误 deviation 偏离

guarantee-warranty periods 保修期 insurer 承保人 negotiation 议标

notice to bidders 投标者需知 open/public bidding 公开招标 potential bidder 潜在投标人 prebid conference 标前会议 prebid meeting 标前会议 prescribe 【v 】规定 public work 公共工程 receipt of bid 接受标书 regulate 规定

release of the bid 放弃投标 representative 代表 retention money 留存款

selected bidding /bid invitation/invitation to bidders 邀请招标

signing of the contract 合同签订 solicits bids 请求投标 successful bidder 中标人 the construction period 施工期 the governing authority 政府机构

the unpaid balance of the contract 合同未结算价款

time-consuming 费时的

unforeseen circumstance 不可预见的情况 variation 变化

Lesson 22

award of contract 合同授予 bid opening 开标

bidding document 招标文件 civil works 土木工程 combination of bids 组合标 commercial bid 商务标 priced proposal 有价格的标书 returned unopened 原封不动返还 technical bid 技术标

the date for latest delivery of bids 投标截止日期the date of invitation to bid 招标日期 the required sureties 被同意的保险人 turnkey contract 交钥匙合同 validity of bids 标书有效期

纸条扩充

agreement is the strongest of them all 协议是具有最高效力的

applying a tensile load 施加一个拉力 bond 担保

brittle material 脆性材料 building material 建筑材料 civil engineering 土木工程 compression test 抗压试验 concentrated load 集中荷载 dam 大坝

distributed load 分布荷载 ductile material 延性材料 force 力 harbor 港口

instructions to bidders 投标者需知 legal residence 法律注册地址 load 荷载

mass transit 公共交通 nonuniform 非均布

population concentration 聚集地 power plat 发电站

prequalification of contractor 资格预审 prescribed 规定 provision 规定

public facilities 必要基础设施 signature 签名 skyscraper 摩天大厦

strength test to destruction 破坏强度试验

strength 抗压强度 tensile strength 抗拉强度 the loaded member 被加载的构件 the proposals 标书 tunnel 隧道 uniform 均布

uniformly distributed load 均布荷载 water and sewage system 给排水系统 weight 自重


相关文章

  • 七年级英语教育教学工作总结
  • 篇一:七年级英语教学工作总结 七年级英语下册教学工作总结 东黄坨中学 杜小秋 本学期我担任七年级(三)班和(四)班英语教学工作, 由于新课改的实施,我对教学工作不敢怠慢,认真学习,不 敢怠慢,深入研究和编写学教案,并且虚心向同事学习,经 过 ...查看


  • 特聘外教熬夜整理:英语作文万能句型!让阅卷老师眼前一亮打满分
  • 高考英语是高中的重点科目,在高考最后冲刺阶段,学生们需要对英语进行一个全面.系统的学习.而在英语学习中,英语作文是考验学生英语成绩的重要标准.一篇作文不仅仅是考验一个学生的英语单词量,而且能够全面认识到学生的英语语法以及句型掌握能力.但是, ...查看


  • 全部职位英语单词
  • 71个单词搞定全部职位说法 2015-08-19 33个常用职位名称: Director Manager 总监 经理 Secretary Assistant 秘书 助理 Representative Account 代表 客服 Planne ...查看


  • 浅谈初中英语的写作教学
  • 浅谈初中英语的书面表达教学 段店中学 熊金环 主题:基于终身发展需要的学习能力的培养 摘要:书面表达是是英语语言的一种综合性表达方式,是对学生所学语言知识的综合运用,是一个系统工程,它应贯穿于教学活动的全过程. 关键词:长期坚持不懈:&qu ...查看


  • 怎么学好初中英语单词?
  • 对于学生来说,初中可以说是学习英语的关键时期.从这个阶段开始,英语的学习更加系统化,同时对于英语单词的量也有了更高的要求.背单词是一个长期的工程,如何掌握单词也有一定的技巧与方法. 众所周知,要学好一种语言,词汇是关键.掌握一定数量的词汇有 ...查看


  • 英语常用单词归类-职业单词汇总(归类1)
  • 英语职业单词汇总(归类1) doctor 医生 engineer 工程师 minister 牧师 clerk 文员 secretary 秘书 professor 教授 actor 演员 editor 编缉 reporter 记者 nurse ...查看


  • (新天地英语培训学校试讲)
  • 攻克词汇关,记单词的方法 舒娅的讲义(新天地英语培训学校试讲) 先从CET 谈起: CET stands for College English Test ----Career Entrance Ticket----Cash Earning ...查看


  • 空中英语课堂伴我成长论文
  • 征文类别:论文类 标 题:小学空中英语课堂伴我成长 姓 名:龚 单 位:湖北省十堰市郧县安阳镇居峪完全小学 通信地址:湖北省十堰市郧县安阳镇居峪完全小学 联系电话: 电子邮件: 丽 0719-7680065 [email protected] ...查看


  • 英语协会活动策划
  • 一. 活动名称:我爱记单词 二. 活动目的: 1.培养和提高全体会员以及全院学生对英语学习的兴趣: 2.通过参与活动让全体会员以及全院学生学会记忆单词,熟练掌握英语学习的技巧. 三.活动意义:使协会所有成员在活动的参与中增进英语知识,活动的 ...查看


  • 各种学位的英语单词
  • 各种学位的英语单词 Ph.D. (Doctor of Philosophy ): 博士学位.而有些领域的博士课程会有不同的学位名称,如D.A.(Doctor of Arts).Ed.D.(Doctor of Education M.B.A. ...查看


热门内容