悬挑防护棚计算书

悬挑防护棚计算书

一、基本参数

侧立面示意图

平面图

三、荷载参数

cca 计算简图:

计算抗弯:

M=0.185kN.m 计算抗剪:

V=1.048kN 计算挠度:

ν=0.16mm 计算简图:

计算抗弯:

M=0.152kN.m 计算抗剪:

V=0.869kN 计算挠度:

ν=0.112mm

承载能力极限状态:

q=1.2×(gk1+gk3)×Lb+1.2×gk4=1.2×(0.35+0.01)×0.7+1.2×0.0333=0.342kN/m 横向次梁的集中力:

R=1.2×Lb×gk4=1.2×0.7×0.0333=0.028kN Pk =1.4pk=1.4×1=1.4kN 正常使用极限状态:

q'=(gk1+gk3)×Lb+gk4=(0.35+0.01)×0.7+0.0333=0.285kN/m 横向次梁的集中力:

R'=Lb×gk4=0.7×0.0333=0.0233kN Pk'=1kN 1.抗弯验算

Mmax=Max(0.185,0.152)=0.185kN.m

σ=Mmax/WX=0.185×106/(4.49×103)=41.105N/mm2≤[f]=205N/mm2 次梁强度满足! 2.挠度验算

νmax=Max(0.16,0.112)=0.16mm≤[ν]=La/400=600/400=1.5mm 次梁挠度满足要求! 3.支座反力计算 极限状态下支座反力:

R次梁=Rmax=Max(1.395,1.183)=1.395kN 正常使用状态下支座反力:

R'次梁=R'max=Max(1.04,0.888)=1.04kN

五、主梁验算

计算抗弯:

M=0.895kN.m 计算抗剪:

V=2.701kN 计算挠度:

ν=5.081mm

下层防护棚传递至悬挑主梁荷载 连接两层短立杆的自重荷载 下层纵向次梁的自重荷载

h×gk4 La×gk4

标准值R'(kN) 1×0.0333=0.033 0.6×0.0333=0.02

设计值R(kN) 1.2×1×0.0333=0.04 1.2×0.6×0.0333=0.024

1.2×5×0.7×0.0333=0.14

1.2×0.6×0.7×0.35=0.176

1.2×0.6×0.7×0.01=0.005 0.385

下层横向次梁的自重荷载

5×Lb×gk4

5×0.7×0.0333=0.117

防护层内材料自重

La×Lb×gk1

0.6×0.7×0.35=0.147

安全网自重荷载 合计

La×Lb×gk3

0.6×0.7×0.01=0.004 0.321

承载能力极限状态:

qx=1.2×q×sinα=1.2×gk5×sin1=1.2×0.0333×0.0175=0.0007kN/m

qy=1.2×q×cosα=1.2×gk5×cos1=1.2×0.0333×0.9998=0.04kN/m Rx=(R次梁+R下排)×sinα=1.78×0.0175=0.0311kN Ry=(R次梁+R下排)×cosα=1.78×0.9998=1.7798kN 正常使用极限状态:

q'x=q×sinα=gk5×sin1=0.0333×0.0175=0.0006kN/m q'y=q×cosα=gk5×cos1=0.0333×0.9998=0.0333kN/m R'x=(R'次梁+R'下排)×sinα=1.361×0.0175=0.0238kN R'y=(R'次梁+R'下排)×cosα=1.361×0.9998=1.3607kN 1.抗弯验算 Mmax=0.895kN.m

σ=Mmax/WX=0.895×106/(4.49×103)=199.31N/mm2≤[f]=205N/mm2 主梁抗弯度满足! 2.挠度验算

νmax=5.081mm≤[ν]=A/400=4240/400=10.6mm 主梁挠度满足要求! 3.支座反力计算 R0=1.342kN R1=3.176kN R2=4.5kN 上拉部分: 第1道上拉:

F1=R1/(sin(α+arctan((S1-L1×sinα)/(L1×cosα))))=3.176/(sin(1+arctan((2.7-1×sin1)/(1×cos1)))) =3.368kN 第2道上拉:

F2=R2/(sin(α+arctan((S2-L2×sinα)/(L2×cosα))))=4.5/(sin(1+arctan((3.3-2.5×sin1)/(2.5×cos1)))) =5.599kN 4.主梁稳定性验算

Nmax=qx×A+Rx((A-a)/Lb+1)+(F12-R12)0.5+(F22-R22)0.5=0.0007×3+0.0311×((3-0.2)/0.7+1)+(3.3682-3.1762)0.5+(5.5992-4.52)0.5=4.61kN

λx=L1/i=1500/15.9=94.34 查《规范》表A得,υ=0.634

σ=N/(υA)=4609.912/(0.634×4.24×102)=17.149N/mm2≤[f]=205N/mm2 主梁稳定性满足要求!

六、主梁与主体结构连接点强度计算

扣件抗滑承载力验算:

Nmax=qx×A+Rx((A-a)/Lb+1)+(F12-R12)0.5+(F22-R22)0.5=0.0007×3+0.0311×((3-0.2)/0.7+1)+(3.3682-3.1762)0.5+(5.5992-4.52)0.5=4.61kN 主梁钢管扣件抗滑移Nmax=4.61kN≤1×12=12kN

主梁与主体结构预埋钢管扣件抗滑移计算:Nlmax=R0×cosα+ Nmax×sinα=1.342×cos1+4.61×sin1= 1.423kN≤Rc=1×12=12kN 主梁扣件抗滑承载力满足要求!

七、拉撑绳杆承载力计算

1.上拉杆件为钢管

S12 轴心受拉稳定性计算: σ=NS/A=5.599×103/489=11.451N/mm2≤f=205N/mm2 符合要求!

钢管扣件抗滑移NS=5.599kN≤1×12=12kN 扣件抗滑承载力满足要求! 角焊缝验算:

τf=NS/(he×lw)=5.599×103/(15×120)=3.111N/mm2≤ftw=160N/mm2 符合要求!

对接焊缝验算:

σ=NS/(lwt)=5.599×103/A=5.599×103/489=11.451N/mm2≤ftw=185N/mm2 符合要求!

悬挑防护棚计算书

一、基本参数

侧立面示意图

平面图

三、荷载参数

cca 计算简图:

计算抗弯:

M=0.185kN.m 计算抗剪:

V=1.048kN 计算挠度:

ν=0.16mm 计算简图:

计算抗弯:

M=0.152kN.m 计算抗剪:

V=0.869kN 计算挠度:

ν=0.112mm

承载能力极限状态:

q=1.2×(gk1+gk3)×Lb+1.2×gk4=1.2×(0.35+0.01)×0.7+1.2×0.0333=0.342kN/m 横向次梁的集中力:

R=1.2×Lb×gk4=1.2×0.7×0.0333=0.028kN Pk =1.4pk=1.4×1=1.4kN 正常使用极限状态:

q'=(gk1+gk3)×Lb+gk4=(0.35+0.01)×0.7+0.0333=0.285kN/m 横向次梁的集中力:

R'=Lb×gk4=0.7×0.0333=0.0233kN Pk'=1kN 1.抗弯验算

Mmax=Max(0.185,0.152)=0.185kN.m

σ=Mmax/WX=0.185×106/(4.49×103)=41.105N/mm2≤[f]=205N/mm2 次梁强度满足! 2.挠度验算

νmax=Max(0.16,0.112)=0.16mm≤[ν]=La/400=600/400=1.5mm 次梁挠度满足要求! 3.支座反力计算 极限状态下支座反力:

R次梁=Rmax=Max(1.395,1.183)=1.395kN 正常使用状态下支座反力:

R'次梁=R'max=Max(1.04,0.888)=1.04kN

五、主梁验算

计算抗弯:

M=0.895kN.m 计算抗剪:

V=2.701kN 计算挠度:

ν=5.081mm

下层防护棚传递至悬挑主梁荷载 连接两层短立杆的自重荷载 下层纵向次梁的自重荷载

h×gk4 La×gk4

标准值R'(kN) 1×0.0333=0.033 0.6×0.0333=0.02

设计值R(kN) 1.2×1×0.0333=0.04 1.2×0.6×0.0333=0.024

1.2×5×0.7×0.0333=0.14

1.2×0.6×0.7×0.35=0.176

1.2×0.6×0.7×0.01=0.005 0.385

下层横向次梁的自重荷载

5×Lb×gk4

5×0.7×0.0333=0.117

防护层内材料自重

La×Lb×gk1

0.6×0.7×0.35=0.147

安全网自重荷载 合计

La×Lb×gk3

0.6×0.7×0.01=0.004 0.321

承载能力极限状态:

qx=1.2×q×sinα=1.2×gk5×sin1=1.2×0.0333×0.0175=0.0007kN/m

qy=1.2×q×cosα=1.2×gk5×cos1=1.2×0.0333×0.9998=0.04kN/m Rx=(R次梁+R下排)×sinα=1.78×0.0175=0.0311kN Ry=(R次梁+R下排)×cosα=1.78×0.9998=1.7798kN 正常使用极限状态:

q'x=q×sinα=gk5×sin1=0.0333×0.0175=0.0006kN/m q'y=q×cosα=gk5×cos1=0.0333×0.9998=0.0333kN/m R'x=(R'次梁+R'下排)×sinα=1.361×0.0175=0.0238kN R'y=(R'次梁+R'下排)×cosα=1.361×0.9998=1.3607kN 1.抗弯验算 Mmax=0.895kN.m

σ=Mmax/WX=0.895×106/(4.49×103)=199.31N/mm2≤[f]=205N/mm2 主梁抗弯度满足! 2.挠度验算

νmax=5.081mm≤[ν]=A/400=4240/400=10.6mm 主梁挠度满足要求! 3.支座反力计算 R0=1.342kN R1=3.176kN R2=4.5kN 上拉部分: 第1道上拉:

F1=R1/(sin(α+arctan((S1-L1×sinα)/(L1×cosα))))=3.176/(sin(1+arctan((2.7-1×sin1)/(1×cos1)))) =3.368kN 第2道上拉:

F2=R2/(sin(α+arctan((S2-L2×sinα)/(L2×cosα))))=4.5/(sin(1+arctan((3.3-2.5×sin1)/(2.5×cos1)))) =5.599kN 4.主梁稳定性验算

Nmax=qx×A+Rx((A-a)/Lb+1)+(F12-R12)0.5+(F22-R22)0.5=0.0007×3+0.0311×((3-0.2)/0.7+1)+(3.3682-3.1762)0.5+(5.5992-4.52)0.5=4.61kN

λx=L1/i=1500/15.9=94.34 查《规范》表A得,υ=0.634

σ=N/(υA)=4609.912/(0.634×4.24×102)=17.149N/mm2≤[f]=205N/mm2 主梁稳定性满足要求!

六、主梁与主体结构连接点强度计算

扣件抗滑承载力验算:

Nmax=qx×A+Rx((A-a)/Lb+1)+(F12-R12)0.5+(F22-R22)0.5=0.0007×3+0.0311×((3-0.2)/0.7+1)+(3.3682-3.1762)0.5+(5.5992-4.52)0.5=4.61kN 主梁钢管扣件抗滑移Nmax=4.61kN≤1×12=12kN

主梁与主体结构预埋钢管扣件抗滑移计算:Nlmax=R0×cosα+ Nmax×sinα=1.342×cos1+4.61×sin1= 1.423kN≤Rc=1×12=12kN 主梁扣件抗滑承载力满足要求!

七、拉撑绳杆承载力计算

1.上拉杆件为钢管

S12 轴心受拉稳定性计算: σ=NS/A=5.599×103/489=11.451N/mm2≤f=205N/mm2 符合要求!

钢管扣件抗滑移NS=5.599kN≤1×12=12kN 扣件抗滑承载力满足要求! 角焊缝验算:

τf=NS/(he×lw)=5.599×103/(15×120)=3.111N/mm2≤ftw=160N/mm2 符合要求!

对接焊缝验算:

σ=NS/(lwt)=5.599×103/A=5.599×103/489=11.451N/mm2≤ftw=185N/mm2 符合要求!


相关文章

  • 悬挑水平大型防护棚搭设方案
  • 华诚大都汇工程(一期)悬挑水平安全硬防护棚 专 项 施 工 方 案 编制人: 审核人: 审批人: 编制单位:四川殷铭建设工程有限公司 编制时间: 2016年12月24日 施工组织设计(悬挑水平防护棚方案)报审表 工程名称:遵义华诚大都汇片区 ...查看


  • 安全防护架2012.12.14
  • 目 录 一.编制依据 ................................................2 二.工程概况 ................................................3 1. ...查看


  • 外防护脚手架方案
  • 大众汽车品牌体验中心工程 汽车坡道外侧安全防护架 施工方案 编制人: 申报人: 审批人: 编制单位: 中集建设集团有限公司 编制日期: 年 月 日 目 录 1.工程概况 . ................................. ...查看


  • 悬挑脚手架搭设通病与防治措施(改)
  • 悬挑脚手架搭设通病与防治措施 邯郸市招贤建筑工程有限公司 李从波 摘要:近年来,随着改革开放的深入及国民经济的快速发展,建筑业作为促进经济建设发展的支柱产业取得了飞速发展,高层或超高层建筑工程越来越多,作为施工配套的悬挑脚手架搭设越来越重要 ...查看


  • 5#楼外墙悬挑脚手架专项施工方案_secret
  • ****科技中心项目外墙脚手架工程搭拆专项施工方案 1.工程概况 .......................................................................... - 1 - 2.编制依据 ...查看


  • 脚手架安全细则
  • 一.项目概况 本工程为安徽省方正房地产开发有限公司投资兴建的"景治园"小区建设工程,座落在合肥市包河区靶场路15号.宁国路以西.总建筑面积为60118.74平方米,框架结构,共包括以下五个单体建筑: 地下室车库:主汽车库 ...查看


  • 外挑架施工方案
  • 目 录 第一节 编制依据 第二节 工程概况 第三节 脚手架方案选择 第四节 脚手架的材质要求 第五节 脚手架的搭设流程及要求 第六节 脚手架计算书 第七节 脚手架搭设的劳动力安排 第八节 脚手架的检查与验收 第九节 脚手架拆除安全技术措施 ...查看


  • 新悬挑脚手架施工方案
  • 一.工程概况 本群体工程为胶南孟家滩旧房改造项目,高层剪力墙结构,楼号分别为:G6.G7.G8.G9.G10.G11.工程地点位于珠海路以南,上海路以东,烟台路以西.其中各楼号单体面积:G6建筑面积15696.45㎡. G7建筑面积2042 ...查看


  • 脚手架施工方案(本溪恒大)
  • 脚手架施工方案 一.工程概况 本工程位于本溪市滨河北路梁家村,由本溪嘉熙臵业公司(恒大地产)投资建设,北京中环世纪工程设计有限责任公司,沈阳市建都工程建设监理有限公司监理,中冶沈勘工程技术有限公司勘察,江苏省第一建筑安装有限公司施工.本工程 ...查看


  • 悬挑扣件式钢管脚手架
  • 东北财经大学网络教育本科毕业论文 悬挑扣件式钢管脚手架 --在高层中建筑施工中的应用 作 者 学籍批次 学习中心 层 次 专 业 指导教师 蔡红梅 0509 三明奥鹏 专升本 工程管理 刘岳鑫 内 容 摘 要 悬挑式脚手架是目前建筑施工中常 ...查看


热门内容